This resolution authorizes the Metropolitan Government of Nashville and Davidson County to abandon approximately 94 linear feet of existing eight-inch water main and accept new water and sanitary sewer infrastructure. The new infrastructure includes 5,354 linear feet of new eight-inch water main (DIP), 873 linear feet of new 12-inch sanitary sewer main (PVC), 3,818 linear feet of new eight-inch sanitary sewer main (PVC), and 164 linear feet of new eight-inch sanitary sewer main (DIP). Additionally, nine fire hydrant assemblies and 21 sanitary sewer manholes will be accepted. These infrastructure changes are necessary to support the Hamilton Church Road Development, with all construction occurring within existing easements. The Metropolitan Planning Commission approved this mandatory referral (No. 2025M-099ES-001) on June 25, 2025. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute necessary documents.